Skip to main content

What do we do?

We supply and assemble the new steel structure, roof and wall cladding and associated fittings here.
The existing steel mock façade at the rear of the building is being dismantled to be reassembled at a new position. The unique feature of this design is that the facade cladding is mounted on the inside of the building so that the steel structure remains visible on the outside.

 

The new steel construction has meanwhile been mounted and the existing steel facade has also been re-assembled in its new position.

 

Impression

We stand for

Craftsmanship

We stand for

a personal and involved approach with short lines

We have

VCA- P certified specialist people with attention to detail

We offer

an integral approach from one party

We stand for

safety and quality

We stand for

open and reliable partnership

View more projects

...
Rebuilding
Winkelcentrum de Koperwiek, 1e fase / 3

De montage van de staalconstructie van zo’n 250T, is afgerond en zijn de eerste dakplaten gelegd. Een deel is onder de metrobaan is gemonteerd, waardoor het metrostation midden in het winkelcentrum zal eindigen. 

Read more
...
Rebuilding
Shopping center De Koperwiek

This third phase will add about 2,500 square meters of new retail space and remodel a portion of the existing shopping center.

Read more
...
Rebuilding
Grolsch Maisinname

Commissioned by Grolsch Novicon realizes a steel structure and the panels around the silos. A nice challenge because it has to be assembled in the hall where there is little space.

Read more