In the first construction phase, most of the passive roofs are removed and replaced. When the existing roof is dismantled, we install new steel columns and edge beams and reinforcements in the existing steel beams. Next, the steel is mounted in the roof plane. Then the roof panels are laid, the cladding and the sandwich panels are mounted on the side wall.

An important starting point is that the shops must remain open during the construction phase. To guarantee this, a temporary work floor will be built. Shoppers will walk under the work floor while construction work takes place on the work floor. During the period that the roof is open and the existing roof construction is replaced for the new roof construction, two pieces of tents will be placed during the construction period in order to optimize the construction process.

 

 

 

 

Impression

We stand for

Craftsmanship

We stand for

a personal and involved approach with short lines

We have

VCA- P certified specialist people with attention to detail

We offer

an integral approach from one party

We stand for

safety and quality

We stand for

open and reliable partnership

View more projects

...
Rebuilding
Winkelcentrum de Koperwiek, 1e fase / 3

De montage van de staalconstructie van zo’n 250T, is afgerond en zijn de eerste dakplaten gelegd. Een deel is onder de metrobaan is gemonteerd, waardoor het metrostation midden in het winkelcentrum zal eindigen. 

Read more
...
Rebuilding
Shopping center De Koperwiek

This third phase will add about 2,500 square meters of new retail space and remodel a portion of the existing shopping center.

Read more
...
Rebuilding
Minivalve expansion

10 years after the completion of Minivalve's new building, Novicon has received a new assignment. This time to expand the rear facade.

Read more