Grolsch Maisinname
Commissioned by Grolsch Novicon realizes a steel structure and the panels around the silos. A nice challenge because it has to be assembled in the hall where there is little space.
What do we do?
Novicon realizes the entire steel construction around the silos. The tanks are then screened off with panels so that certain odors cannot be smelled throughout the hall. The panels are also mounted airtight.
Impression
View more projects
Winkelcentrum de Koperwiek, 1e fase / 3
De montage van de staalconstructie van zo’n 250T, is afgerond en zijn de eerste dakplaten gelegd. Een deel is onder de metrobaan is gemonteerd, waardoor het metrostation midden in het winkelcentrum zal eindigen.
Read moreShopping center De Koperwiek
This third phase will add about 2,500 square meters of new retail space and remodel a portion of the existing shopping center.
Read moreMinivalve expansion
10 years after the completion of Minivalve's new building, Novicon has received a new assignment. This time to expand the rear facade.
Read more