The renovation is being carried out in several phases because it is a major project in the urban area of The Hague. The various stakeholders, such as local residents, shoppers, pedestrians, cyclists and all other traffic, must be taken into account. In order to guarantee safety, a construction safety plan was drawn up in consultation with the municipality and the client.

The activities assigned to Novicon in phase two is the realization of a parking garage. This parking garage will be constructed from a steel construction that will be provided with hollow-core slab floors, various stairwells and a footbridge Ultimately, 187 tonnes of steel will be processed in this phase. In phase 3, the existing parking deck will be tackled and extra steel will be mounted and kept in tension in order to keep the entire construction load-bearing so that part of the parking deck can eventually be removed. This is where the two so-called tapis roulant conveyors will be placed. These conveyors ensure that visitors can easily move from the shopping centre to the parking deck with their shopping carts. In this phase Novicon assembles 55 tons of steel and provide the walkway and the escalator house with a steel roof.

The special feature of this project is that it is a complex renovation and expansion because the shopping and residential area is in full operation.

Impression

We stand for

Craftsmanship

We stand for

a personal and involved approach with short lines

We have

VCA- P certified specialist people with attention to detail

We offer

an integral approach from one party

We stand for

safety and quality

We stand for

open and reliable partnership

View more projects

...
Roof and facade cladding
LNG Terminal GATE op de Maasvlakte bouwt een 4e LNG Tank

Novicon levert een belangrijke bijdrage aan de uitbreiding van GATE Terminal op de Maasvlakte. Wij leveren al het benodigde staalwerk en zijn verantwoordelijk voor de montage. Daarnaast verzorgen wij de dak- en wandbeplating van het compressorgebouw, inclusief geluiddempende roostergevels.

Read more
...
Steel construction
Update Greenergy Biofuels Amsterdam

De huidige fabriek van Greenergy in Amsterdam breidt de biodieselproductie uit door een nieuwe fabriek direct tegen de bestaande aan te laten bouwen. Novicon verzorgt de staalconstructie, trappen, roostervloeren, hekwerken en supportframes, maar verzorgt tevens het plaatsen van alle equipment.

Read more
...
Steel construction
Greenergy Biofuels Amsterdam

Novicon plaatst de deacidification column bij Greenergy Biofuels Amsterdam.