Octagon Leiden
Time for an update. Part of the steel structure is a challenging truss. Prior to assembly, the truss was fitted in our workshop and the assembly went without a hitch. The truss will eventually be integrated into several floors, and due to the high forces it is equipped with heavy duty nodes, which are completely welded together from sheet metal.
Part of the steel structure is a challenging truss. The truss is assembled and this went off without a hitch.
April 2022
The finishing touches are being put on the steel structure for our Octagon project in Leiden. The heavy junctions have been welded and inspected and have been taken to the painter. We are supplying the entire steel structure for this special new building project. The entire process is under our own management, from engineering to assembly.